View Single Post
Old 02-07-2009, 11:44 PM   #7 (permalink)
A-PLUS
Moderator
 
A-PLUS's Avatar
 
Join Date: Sep 2008
Location: Myrtle Beach, SC
Posts: 566
Default

That was my first one.

We had to use staight muratic. Got the call Saturday, had to do the job on
Sunday.

Lots of PPE, goggles, respirator, gloves, and a towel over my head. LOL
A-PLUS is offline   Reply With Quote